Presentation + Paper
13 December 2020 Scaling agile for the Square Kilometre Array
Author Affiliations +
Abstract
The design stage of the first phase of the Square Kilometre Array (SKA) telescopes has been recently completed by the SKA Organisation (SKAO). This marks the initial step towards an ambitious vision of designing, constructing, and operating telescopes with an equivalent collecting area of one square kilometre. At the completion of this design stage the project has entered a bridging period to manage work until construction funds are available. During this period many of the software teams from the design stage have been engaged in prototyping lean-agile processes, structures, and practices. By the end of the period the goal is to have pivoted from a document based, stage-gated set of processes arranged around design consortia to a code based, value-flow driven, lean-agile set of processes unified around the Scaled Agile Framework. Two years since the start of this transformation this paper reflects on these processes. We highlight some practices that have been found helpful, as well as the challenges faced. The implementation status is described, along with the main technical and cultural implications, and the preliminary results of adopting a lean-agile culture within the SKA Organisation.
Conference Presentation
© (2020) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Marco Bartolini, Ray Brederode, Alan Bridger, Daniel Espada, Ferdl Graser, Piers Harding, Maurizio Miccolis, Vivek Mohile, Ben Mort, Aristeidis Nuostos, Nick Rees, Juande Santander-Vela, Snehal Valame, Peter Wortmann, and Ugur Yilmaz "Scaling agile for the Square Kilometre Array", Proc. SPIE 11452, Software and Cyberinfrastructure for Astronomy VI, 114520B (13 December 2020); https://doi.org/10.1117/12.2562213
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Optical instrument design

Telescopes

Prototyping

RELATED CONTENT

The MICADO first light imager for ELT from hexapod...
Proceedings of SPIE (July 11 2018)
Dichroic beam splitter for convergent beams
Proceedings of SPIE (August 16 2000)
The Pan-STARRS PS4 telescope suite
Proceedings of SPIE (July 10 2008)
VLT 8-m unit telescope main structure
Proceedings of SPIE (March 21 1997)
Engineering a global network of astronomical telescopes
Proceedings of SPIE (July 03 1998)

Back to Top