Paper
15 March 1998 Ultrasonic evaluation of flood gate tendons
Graham H. Thomas, Albert E. Brown
Author Affiliations +
Abstract
Our water resources infrastructure is susceptible to aging degradation just like the rest of this country's infrastructure. A critical component of the water supply system is the flood gate that controls the outflow from dams. Long steel rods called tendons attach these radial gates to the concrete in the dam. The tendons are typically forty feet long and over one inch in diameter. Moisture may seep into the grout around the tendons and cause corrosion. Lawrence Livermore National Laboratory is working with the California Department of Water Resources to develop advanced ultrasonic techniques for nondestructively inspecting their tendons. A unique transducer was designed and fabricated to interrogate the entire tendon. A robust, portable unit was assembled that included a computer controlled data acquisition system and specialized data processing software to analyze the ultrasonic signals. This system was tested on laboratory specimens and is presently being fielded at two dam sites.
© (1998) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Graham H. Thomas and Albert E. Brown "Ultrasonic evaluation of flood gate tendons", Proc. SPIE 3398, Nondestructive Evaluation of Utilities and Pipelines II, (15 March 1998); https://doi.org/10.1117/12.302516
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Ultrasonics

Transducers

Floods

Inspection

Corrosion

Control systems

Data acquisition

Back to Top