Paper
16 August 1999 Examination of optimal upgrade timing and best value: DoD acquisition of commercial vs. military custom flat panel displays
Michael J. Lippitz
Author Affiliations +
Abstract
This paper proposes a framework for quantitatively balancing the costs, benefits, and risks of alternate upgrade strategies, with Department of Defense (DoD) acquisition of flat panel display as an example. A key issue in DoD Acquisition Reform is the rapid product turnover in commercial markets and the difficulties DoD has traditionally faced in adopting these advances in a timely manner. This paper aims to clarify when commercial technology represents 'best value' to DoD.
© (1999) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Michael J. Lippitz "Examination of optimal upgrade timing and best value: DoD acquisition of commercial vs. military custom flat panel displays", Proc. SPIE 3690, Cockpit Displays VI: Displays for Defense Applications, (16 August 1999); https://doi.org/10.1117/12.357616
Lens.org Logo
CITATIONS
Cited by 3 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Defense and security

Flat panel displays

Systems modeling

Defense technologies

Defense systems

Standards development

Ferroelectric LCDs

RELATED CONTENT

Mimic adjudication scheme based on homomorphic encryption
Proceedings of SPIE (March 28 2023)
Cost efficiency of simulation-based acquisition
Proceedings of SPIE (September 04 2003)
Summary of DoD display acquisition workshops
Proceedings of SPIE (August 16 1999)
Acquisition of flat panel displays for military applications
Proceedings of SPIE (September 14 1998)

Back to Top