Paper
19 July 2010 Automated metrology simulator for multi-objects instruments
Author Affiliations +
Abstract
The most challenging of the metrology needs of multi-objects instruments is the registration of the pupil on the deformable mirror which corrects the wavefront errors. Pick-off mirrors in multi-objects instruments and specially spectrographs (MOS) require accurate positioning and simultaneous viewing of the pupil on the deformable mirror (DM) and the focal plane image on the image slicer at the sub-micron level. A laboratory test prototype simulating the telescope (E-ELT), the beam steering mirror (BSM) and the pupil imaging mirror (PIM), is presented to confirm the correct positioning of the pupil on the DM and to provide the movements of the moveable optical elements to achieve it. The opto-mechanical design and testing of this prototype is shown. The BSM stages (Goniometric cradle, Rotation, & Linear) provide the key mechanical system elements, with precision alignment, resolution, and repeatability . The design and behaviour of the control system is discussed; the ultimate aim of which is to adjust the BSM and PIM to correct for any slight mis-positioning of the pick-off mirror and any temporal drift of all the components to achieve the required alignment. The control system can also cope with flexure effects when required.
© (2010) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Eli Atad-Ettedgui, Colin Dickson, Steven Beard, Xiaofeng Gao, Brian Stobie, Peter Hastings, and Helen M. McGregor "Automated metrology simulator for multi-objects instruments", Proc. SPIE 7739, Modern Technologies in Space- and Ground-based Telescopes and Instrumentation, 77390O (19 July 2010); https://doi.org/10.1117/12.855777
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Cameras

Mirrors

Metrology

Device simulation

Calibration

Control systems

Telescopes

RELATED CONTENT

Subaru Telescope
Proceedings of SPIE (August 25 1998)
The thermal control system of the X ray telescope eROSITA...
Proceedings of SPIE (September 17 2012)
Nulling at the Keck interferometer
Proceedings of SPIE (June 23 2006)
Simulation system for a correlation tracker
Proceedings of SPIE (September 05 2002)

Back to Top