Paper
22 July 2014 LSST Telescope and site status
W. Gressler, J. DeVries, E. Hileman, D. R. Neill, J. Sebag, O. Wiecha, J. Andrew, P. Lotz, W. Schoening
Author Affiliations +
Abstract
The Large Synoptic Survey Telescope (LSST) has recently completed its Final Design Review and the Project is preparing for a 2014 construction authorization. The telescope system design supports the LSST mission to conduct a wide, fast, deep survey via a 3-mirror wide field of view optical design, a 3.2-Gpixel camera, and an automated data processing system. The observatory will be constructed in Chile on the summit of Cerro Pachón. This paper summarizes the status of the Telescope and Site group. This group is tasked with design, analysis, and construction of the summit and base facilities and infrastructure necessary to control the survey, capture the light, and calibrate the data. Several early procurements of major telescope subsystems have been completed and awarded to vendors, including the mirror systems, telescope mount assembly, hexapod and rotator systems, and the summit facility. These early contracts provide for the final design of interfaces based upon vendor specific approaches and will enable swift transition into construction. The status of these subsystems and future LSST plans during construction are presented.
© (2014) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
W. Gressler, J. DeVries, E. Hileman, D. R. Neill, J. Sebag, O. Wiecha, J. Andrew, P. Lotz, and W. Schoening "LSST Telescope and site status", Proc. SPIE 9145, Ground-based and Airborne Telescopes V, 91451A (22 July 2014); https://doi.org/10.1117/12.2056711
Lens.org Logo
CITATIONS
Cited by 18 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Mirrors

Large Synoptic Survey Telescope

Telescopes

Cameras

Control systems

Actuators

Imaging systems

RELATED CONTENT

LSST telescope and site status
Proceedings of SPIE (July 27 2016)
LSST telescope and site status
Proceedings of SPIE (July 06 2018)
LSST primary/tertiary mirror cell assembly integration
Proceedings of SPIE (July 06 2018)
LSST Telescope primary/tertiary mirror cell assembly
Proceedings of SPIE (August 04 2010)
LSST secondary mirror assembly baseline design
Proceedings of SPIE (September 17 2012)
SOAR 4.1-m Telescope: from commissioning to early science
Proceedings of SPIE (September 28 2004)

Back to Top