Paper
15 July 2016 Ongoing evolution of proposal reviews in the Spitzer warm mission
Lisa J. Storrie-Lombardi, Suzanne R. Dodd, Nancy A. Silbermann, L. M. Rebull, Seppo Laine, Megan Crane, John Stauffer, Lee Armus
Author Affiliations +
Abstract
The Spitzer Space Telescope is executing the seventh year of extended warm mission science. The cryogenic mission operated from 2003 to 2009. The observing proposal review process has evolved from large, week-long, in-person meetings during the cryogenic mission to the introduction of panel telecon reviews in the warm mission. Further compression of the schedule and budget for the proposal solicitation and selection process led to additional changes in 2014. Large proposals are still reviewed at an in-person meeting but smaller proposals are no longer discussed by a topical science panel. This hybrid process, involving an in-person committee for the larger proposals and strictly external reviewers for the smaller proposals, has been successfully implemented through two observing cycles. While people like the idea of not having to travel to a review it is still the consensus opinion, in our discussions with the community, that the in-person review panel discussions provide the most satisfying result. We continue to use in-person reviews for awarding greater than 90% of the observing time.
© (2016) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Lisa J. Storrie-Lombardi, Suzanne R. Dodd, Nancy A. Silbermann, L. M. Rebull, Seppo Laine, Megan Crane, John Stauffer, and Lee Armus "Ongoing evolution of proposal reviews in the Spitzer warm mission", Proc. SPIE 9910, Observatory Operations: Strategies, Processes, and Systems VI, 991012 (15 July 2016); https://doi.org/10.1117/12.2231788
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Gemini Observatory

Observatories

Databases

Fourier transforms

Head

Software development

Telescopes

RELATED CONTENT

The Gemini Observatory fast turnaround program
Proceedings of SPIE (August 06 2014)
Gemini queue planning
Proceedings of SPIE (July 12 2008)
Software design of the Gemini 8-m Telescopes
Proceedings of SPIE (March 21 1997)
ORAC: a modern observing system for UKIRT
Proceedings of SPIE (June 16 2000)
New observing concepts for ESO survey telescopes
Proceedings of SPIE (July 29 2010)

Back to Top